城市轨道交通专业英语复习

发布 2021-05-18 19:59:28 阅读 5932

考试题型:①英汉互译。

选择题(10题)

③英译汉。④汉译英。

⑤作文。一、词汇。

aaccess to platforms 站台入口。

additional coach 加挂列车。

additional train 加开列车。

arrival and departure siding 到发线。

assistant driver/motorman 副司机。

assistant station master 副站长。

atc signal 列车自动控制信号。

automatic door operation 自动开关车门。

automatic train control (atc)列车自动控制。

automatic train operation (ato)列车自动运行,列车自动驾驶。

bbaggage office/room 行李房。

ballast 道砟,道床。

berth ticket 卧铺车票。

boarding gate 检票口。

box car/wagon 棚车。

ccab 司机室,驾驶室。

carriage with cushioned berths 软卧车。

carriage with cushioned seats 软坐车。

carriage with hard seats 硬座车。

carriage with semi-cushioned berths 硬卧车。

check ticket 检票,查票。

chief conductor 列车长。

chief dispatcher 调度长。

city railway 城市铁路。

coach no.6 六号车厢。

consist 列车编组顺序表【美】;车列【美】

container 集装箱。

crew 乘务组;乘务人员。

crew car 宿营车。

crew member/man乘务人员。

crew room 乘务员室。

ddining-car 餐车。

direct train 直达车。

down direction 下行方向。

eelectric multiple-unit(emu)电动车组。

emergency braking 紧急制动。

entrance 入口,进站口。

exit 出口,出站口。

express ticket 特快车票。

ggrade crossing 平面交叉;平交道口,道口【美】

guests’waiting-room 贵宾候车室。

hhead driver=head engineer 司机长。

he**y rail 重轨。

high-speed intercity train 高速城际列车。

hump 驼峰。

hump yard 驼峰调车场。

iinformation bureau 问讯处【美】

in transfer to 中转到。

issuing station 售票站。

llevel crossing 平面交叉,平交道口。

light rail 轻轨。

locomotive 机车。

locomotive depot 机务段。

long-distance passenger train 长途旅客列车。

lower berth 下铺。

luggage office=baggage office 行李房,行李托运处。

luggage storage service 行李寄存处。

mmaglev(magnetically levitated)train 磁悬浮列车。

main-line coach 干线客车。

maintenance维修,保养。

metro 地铁。

middle berth 中铺。

monorail 单轨铁路。

ppassenger service 客运。

passenger station 客运站。

people mover 小型快速交通系统。

personal rapid transit system小型快速交通系统。

pick-up goods train 摘挂列车。

platform 站台。

points 道岔。

rrailway signaling 铁路信号。

railway station 火车站。

railway transport/transportation铁路运输。

rapid transit 快速交通系统。

reception and departure of trains 接发列车。

refund of ticket 退票。

rolling stock 机车车辆总称。

round-the-clock service 昼夜服务。

round-trip fare 往返票价。

sservice charge 手续费。

service counter 服务台。

station attendant 车站服务员。

station facilities 车站设备。

station master 站长。

station operator 车站值班员。

straddle monorail 跨骑式单轨铁路。

suspended monorail 悬挂式单轨铁路。

tterminal 终点站;枢纽。

ticket office=booking office=reservation office 售票处。

ticket valid 车票有效期。

time interval 时间间隔。

to endorse ticket 签票。

tofc(trailer on flat car)平车装运的集装箱挂车。

tunnel 隧道;地道。

uunclaimed baggage 无人认领行李。

underground 地铁。

unmanned crossing=unstaffed level crossing 无人看守道口。

up direction 上行方向。

upper berth 上铺。

vvehicle 车辆;运输工具。

wwaiting room 候车室。

waiting-room for soft seat passengers 软席候车室。

二、选择题。

unit 2

1、the dictionary definition of a train is a long line of vehicles tr**eling in (c)direction.

a、different b、left c、the same d、right

2、a maglev train floats about(a)mm above the guideway on a magnetic field.

a、10 b、11 c、9 d、8

3、because there are no wheels running along there is no wheel(b).

a、maintenance b、noise c、disturbance d、resistance

4、of the 5,000 km that t** trains serve in france,only about (c)km is high speed line.

a、1,000 b、1,100 c、1,200 d、1,300

5、the vast majority of resistive force at high speed is(a)resistance.

a、air b、friction c、electricity d、heat

unit10

1、a rapid transit usually has high capacity and frequency,with large trains and total or near total(c)separation from other traffic.

a、level b、part c、grade d、whole

2、power is commonly supplied by means of a single live third rail at(a)volts.

a、600 to 750 b、700 to 850 c、500 to 650 d、800 to 950

3、metro systems generally use(b)power.

a、ac b、dc c、overhead d、return

4、rubber tires system is much (a)than conventional steel-wheeled trains.

a、quieter b、noisier c、larger d、smaller

5、some cities with steep hills incorporate(c)railway technologies into their metros.

a、underground b、suspended c、mountain d、conventional

unit14

1、(a)is a station sited where a railway line ends or terminates.

a、a terminus b、an interchange c、a union d、a depot

2、a(c)is a stopping place that may not even h**e platform.

a、taxi rank b、bus bay c、halt d、pub

3、some stations h**e unusual platform layouts,due to space constraints of the station location,or the (d)of the railway lines.

a、curve b、elevation c、parallel d、alignment

4、considerrations for people with disabilities include elevator or (a)access to all platforms,matching platform height to train floors,etc.

a、ramp b、hump c、camp d、lamp

5、there are safety measures for disabled people,such as(b)marking of platform edges and covering of third rail.

城市轨道交通实践课程考核方案

城市轨道交通实践 课程考核方案。请同学们仔细阅读第一至三点,然后根据自己的工作实践完成第四和五点。要求 word形式,文件命名格式 学号 姓名。一 实习目的和主要任务。1 了解车辆结构 了解车辆各部件及检修现场,了解供电及接触网。2 了解城轨交通通信系统组成,了解6502继电联锁及计算机联锁系统,了...

2023年智能交通与城市轨道交通投资分析报告

2011年3月。目录。一 交通拥堵 人 路 车 之间矛盾突出,亟待解决 41 城镇化提高和乘用车数量激增是主要原因 52 城市道路交通建设进展缓慢加剧拥堵 5 3 交通拥堵引致巨额损失,亟需应对之策 6二 化解交通拥堵的利器 智能交通和城市轨道交通 61 治堵 限制用路需求并非唯一选项 6 2 智能...

城市轨道交通实训心得体会

城市轨道交通实训心得体会。篇一 城市轨道交通工程技术专业实习总结范文。浙江大学优秀实习总结汇编 城市轨道交通工程技术岗位工作实习。期总结。转眼之间,两个月的实习期即将结束,回顾这两个月的实习工作,感触很深,收获颇丰。这两个月,在领导和同事们的悉心关怀和指导下,通过我自身的不懈努力,我学到了人生难得的...