目录。11、 设备检验(30句)
inspection of the equipment
12、 土建工程(18句)
civil engineering
13、 施工机械(18句)
construction machinery
14、 常用工具(22句)
common tools
15、 工程材料(18句)
engineering materials
16、 设备安装(24句)
erection of the equipment
17、 工艺管道(22句)
process piping
18、 质量管理(20句)
quality control
19、 试车和开工(30句)
test run and start-up
20、 在宴会上(26句)
at the banquet
十。一、设备检验(30句)
inspection of the equipment
273、shall we go to the warehouse to check the equipment?
274、i believe that all the machines to be shipped h**e been pre-assembled (inspected).
我相信所有发运的机器都曾经过预装配(检验)。
275、where is the packing list (bill of lading, bill of materials)?
装箱单(提货单、材料清单)在那里?
276、what is the item number (case number) of this equipment?
这台设备的位号(箱号)是多少?
277、how many cases are there in the package of this equipment?
这台设备分几箱包装?
278、what does this mark (symbol) mean?
这个标志(符号)是什么意思?
279、all the equipment must be fitted with nameplates.
所有的设备都钉有铭牌。
280、first of all, we must check the delivery schedule (date of delivery) of the equipment.
首先,我们必须核查设备的交货计划(交货日期)。
281、what about the mechanical guarantee of the equipment?
设备的机械保证情况如何?
282、we h**e placed an order for pumps with a factory.
我们已向一家工厂定购泵机。
283、we h**e planned to finish the inspection of the equipment before sunday.
我们计划在星期天以前完成设备的检查工作。
284、this equipment is supplied by the seller (buyer).
这台设备是卖方(买方)**的。
285、this is the equipment in completed conditions, that is the equipment fabricated at plant site.
这是整体设备,那是现场制作的设备。
286、this equipment is shipped from the japan (united states of america, england, france, italy, federal republic of germany, singapore).
这台设备是从日本(美国、英国、法国、意大利、联邦德国、新加坡)发运过来的。
287、the equipment is delivered to here by sea (air railway, road).
这台设备是通过海运(空运、铁路、公路)发货到此的。
288、the port of destination is chittagang (shanghai, whampoa, kwangchow, tsingtao).
到达港是吉大港(上海、黄埔、广州、青岛)。
289、the over-sized equipment which is over 3.4 m in width, 3.1m in height, 18m in length and 50 tons in weight.
超限设备的限度为超过宽3.4米、高3.1米、长18米和重量50吨。
290、please pay attention to the following marks on the package.:
请注意包装箱上的下列标志:
use rollers 使用滚杠移 he**e here 从此提起。
handle with care 小心装卸 top 上部。
bottom 底部inflammable 易燃。
fragile 易碎do not cast 勿掷。
keep upright 勿倒置 keep in a cold (dry) place 存于冷(干)处。
to be protected from cold (heat) 怕冷(热)
291、how much does this equipment weigh?
这台设备多重?
292、the gross (net)weight of this case is fourteen tons (pounds).
这箱毛(净)重14吨(磅)。
293、let us check the quantity of the parts (accessories) according to the packing list (shipping list).
让我们根据装箱单(发货清单)来核查零件(附件)数量。
294、shall we check it again (once more)?
我们再检查一次(再查一遍)好吗?
295、it has been damaged (rusted) here, let us take a picture (photograph
. 此处已经损坏(锈蚀),我们来照个相。
296、the packaging has to be improved.
这个包装必须改进。
297、we should record what the damage and lack of parts.
我们应该把损坏和缺件情况作个记录。
298、we must **oid so far as possible the damage of equipment during storage.
我们必须尽量避免设备在储存期间损坏。
299、please sign your name to the check list.
请你在检验单上签个字。
300、your side must compensate us for our loss.
你方必须赔偿我们的损失。
301、we must pack the spare parts into another box..
我们应该将备件另行装箱。
302、all of the equipment are made in china.(japan)
所有的设备都是中国(日本)制造的。
十。二、土建工程(18句)
civil engineering
303、all of the civil work on the field will be executed by us (our company).
所有现场的土建工作都将由我们(我公司)承担实施。
304、civil engineering design is performed on our own at home.
土建工程是根据卖方提供的技术条件设计的。
306、this is a working (plot plan, vertical layout, structure plan, floor plan, general plan) drawing.
这是施工(平面布置、竖向布置、结构、屋间平面、总)图。
307、the quality of civil engineering conforms with our domestic technical standard (china national building code).
土建工程的质量符合我们国内的技术标准(中国建筑法规)。
308、our civil work include construction of roads, buildings, foundations and reinforced concrete structure.
我们的土建工作包括建造道路、建筑物、基础和钢筋混凝土结构。
309、it will take two weeks to complete this building (foundation).
这房子(基础)需要两周时间才能完成。
310、sand, brick, and stone are generally used in constructing houses.
砂、砖和石头通常用于建造房屋。
311、these are the anchor bolts (rivets, unfinished bolts, high-strength structural bolts) for the structure.
这是用于结构的锚定螺栓(铆钉、粗制螺栓、高强度结构用螺栓)。
312、the holes of anchor bolts will be grouted with normal (portland ,non-shrinkage) cement mortar.
酒店常用英语500句 下
301 we h e single rooms,double rooms,suites and deluxe suites in our hotel.我们宾馆有单间 双人间 套间和豪华套间。302 did you h e a reservation with us?您在我们这儿预订房间了吗?303 ...
工程现场用语500句
conversation for construction 原书编辑 李忠民。英语翻译 李忠民。英语审核 朱勤。原化学工业部施工技术信息总站。中国化学工程第三建设公司。1998年。1 问候和介绍 36句 greetings and introductions 2 交谈语言 24名 talking a...
英语谚语500句
2009 03 02 20 56 26 he sits no sure that sits too high.高处不胜寒。he that respects not is not respected.欲受人敬,要先敬人。so said,so done.说到做到。言出必行。haste makes was...