好东西大家分享啊。
船舶制造英语日常用语一.? 船体。
1.you must weld and grind this area before painting.在油漆之前你必须把这个地方电焊修补、打磨好。
2.this welding line should be gouged and welded again before tightness inspection.这条焊缝在密性检查前要碳刨、再焊。
3.the structure of the starboard side is different from the port side.右舷的结构跟左舷的不一样。
4.we should reinforce the downside of the windlass.我们应该在锚机的反面加强。
5.the n**igation deck is not plain,we will fair the deck by hot working.驾驶甲板不平,我们要火工校正。
6.there are two pieces of stiffeners and brackets must be replaced.有两块加强筋和肘板要换新。
7.two more footrests and handgrips should be installed at the entrance of the small hatchcover.在小舱口盖的进口处再安装两只踏步和拉手。
8.checking the joint accuracy and structure integrity between no.8 and no.9 block after 与no9分段合拢后大接头装配精确性和结构完整性检查。
9.checking structure integrity of superstructure(deckhouse)after welding.上层建筑焊后结构完整性检查。
10.inspecting fitting accuracy of hatch coaming on board.货舱口围板船上安装精度检查。
11.inspection air pressure test(with water head) for no1. water ballast tank(no15 block).no1压载水舱(no.
15分段)气压试验(压头试验)检查。12.inspection hosing test for upper deck.上甲板冲水试验检查。
13.measuring hull’s main dimensions: length overall(loa.),length between perpendiculars(lpp.
),breathmolded(b.),depth molded(d.) and deflection before launching.
下水前测量船体主尺度:总长、两柱间长、型宽、型深、基线挠度。
14.inspection distance between draught marks and keel plate after marking out.划线后检查吃水标尺至平板龙骨之间的距离。
15.inspecting fitting accuracy of draught mark(loading line mark).吃水标志(载重线标志)安装精确性检查。
16.inspection welding seam and dimension of cargo hatch cover.货舱舱口盖焊缝和尺度检查。二.轮机。
1.inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).
螺旋桨轴(中间轴)机加工尺寸检查。2.flushing of piping system for steering gear.舵机管路系统的投油清洗。
25.mooring test of steering gear.舵机系泊试验。
26.manoeuving test of steering gear during sea trial.舵机航行中操舵试验。
27.emergency manoeuving test of steering gear.舵机应急操舵试验。
28.installation and alignment inspection of windlass.锚机安装与校中检查。
29.anchoring and weighing test of windlass on sea trial.锚机航行中抛起锚试验。
30.adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).舵机(锚机、绞缆机)液压系统安全装置调整。
31.running test and loading test for 4t provision crane.4吨食物吊运转试验和吊重试验。
32.lowering and hoisting test for life boat.救生艇收放试验。
33.loading test of accommodation ladder(pilot ladder).舷梯(引水员梯)压重试验。
34.checking liner of main engine(主机垫片检查。
35.tightening inspection for through bolts of main engine(主机贯穿螺栓紧固度检查。
36.aligning main engine’s crank shaft and intermediate shaft after launching.下水后主机曲轴和中间轴连接后校中。
37.aligning intermediate shaft and propeller shaft after launching.下水后中间轴和螺旋桨连接后校中。
38.measuring deflection of crank shaft of before starting up(after sea trial).主机动车前(航行试验后)曲轴甩档测量。39.flushingpainting rm.
船舶制造必备英语日常用语句
好东西大家分享啊。船舶制造英语日常用语一 船体。1 youmustweldandgrindthisareabeforepainting.在油漆之前你必须把这个地方电焊修补 打磨好。2 这条焊缝在密性检查前要碳刨 再焊。3 右舷的结构跟左舷的不一样。4 weshouldreinforcethedown...
船舶制造英语日常用语 轮机
1 inspection machining dimension of propeller shaft intermediate shaft or counter shaft 螺旋桨轴 中间轴 机加工尺寸检查。2 check for surface contact area metallic con...
船舶制造英语日常用语 电气
1 inspection main cable installation for wheel house before paneling decoration.敷板前驾驶室检查主干电缆安装。2 measuring insulation resistance and reliability test ...