1. inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).

螺旋桨轴(中间轴)机加工尺寸检查。

2. check for surface contact area(metallic contact) between stern shaft and propeller hub tapers. 检查螺旋桨轴与螺旋桨锥度接触面。

3. inspection machining dimension of rudder stock.

舵杆机加工尺寸检查。

4. inspection rudder carrier after assembly.

上舵承组装后检查。

5. inspection machining dimension of rudder pintle.

舵销机加工尺寸检查。

6. inspection alignment of stock, rudder blade and pintle.

舵杆、舵叶、舵销连接后中心线检查。

7. lowering test and tension test of anchor.

锚投掷试验和拉力试验。

8. measuring dimension of shaft coupling bolts and reamer hole.

轴系连接螺栓和钻孔尺寸测量。

9. inspection installation correctness of ship’s name plate(funnel mark).

船名牌(烟囱标志)安装正确性检查。

10. flexibility and hosing test for small water tight hatch cover(water tight door and window).

水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。

11. tightness test(opening and closing test,emergency opening and closing test)for cargo hatch cover.

货舱舱口盖密性试验(启闭试验、应急启闭试验)。

12. inspecting anchor throwing away appliance.

弃锚装置检查。

13. inspecting centerline positioning for shaft system and rudder system before boring.

轴、舵系镗孔前中心线定位检查。

14. optical aligned check for shaft system after boring.

轴系镗孔后光学校中检查。

15. hydraulic test for pipe for stern tube.

艉轴管滑油液压试验。

16. measuring diameter of fore and aft stern tube bearing and bushes.

艉轴管前、后轴承与衬套直径测量。

17. inspection push-up load for fore and aft stern tube bushes.

艉轴管前、后衬套压入检查。

18. measuring clearance between propeller shaft & bearing.

螺旋桨轴与轴承间隙测量。

19. flushing of stern tube.

艉轴管滑油系统的投油清洗。

20. inspecting zero(datum) position of rudder blade.

舵叶0位检查。

21. measuring clearance of rudder jumping stopper.

舵止跳块的间隙测量。

22. inspecting integrity of steering gear.

操舵装置完整性检查。

23. measuring installation clearance of rudder bearing.

舵轴承安装间隙测量。

24. flushing of piping system for steering gear.

舵机管路系统的投油清洗。

25. mooring test of steering gear.

舵机系泊试验。

26. manoeuving test of steering gear during sea trial.

舵机航行中操舵试验。

27. emergency manoeuving test of steering gear.

舵机应急操舵试验。

28. installation and alignment inspection of windlass.

锚机安装与校中检查。

29. anchoring and weighing test of windlass on sea trial.

锚机航行中抛起锚试验。

30. adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).

舵机(锚机、绞缆机)液压系统安全装置调整。

31. running test and loading test for 4t provision crane.

4吨食物吊运转试验和吊重试验。

32. lowering and hoisting test for life boat.

救生艇收放试验。

33. loading test of accommodation ladder(pilot ladder).

舷梯(引水员梯)压重试验。

34. checking liner of main engine(

主机垫片检查。

35. tightening inspection for through bolts of main engine(

主机贯穿螺栓紧固度检查。

36. aligning main engine’s crank shaft and intermediate shaft after launching.

下水后主机曲轴和中间轴连接后校中。

37. aligning intermediate shaft and propeller shaft after launching.

下水后中间轴和螺旋桨连接后校中。

38. measuring deflection of crank shaft of before starting up(after sea trial).

主机动车前(航行试验后)曲轴甩档测量。

39. flushing lubrication oil(fuel oil) system of m/e.

主机滑油(燃油)管路投油清洗。

40. alignment inspection installation of shaft generator and gear box.

轴带发电机及齿轮箱安装检查。

41. alarm testing and safety device testing of m/e.

主机报警和安全装置试验。

42. mooring test(sea trial) of inspection attached pumps and piping system.

主机系泊(航行)试验并检查其附属泵与管路。

43. running test of shaft generator and clutching test between and shaft generator.

轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验。

44. change over test between shaft generator and diesel generator on sea trial.

航行试验中轴带发电机与柴油发电机之间的换车试验。

45. overhauling main engine after sea trial.

主机航行试验后的拆检。

46. installation inspection of main diesel generator.

主柴油发电机组安装检查。

47. safety device testing for emergency diesel generator.

应急柴油发电机的安全装置试验。

48. charging test and safety valve and automatic device adjusting for main compressor (auxiliary compressor).

主(辅)空气压缩机的充气试验、安全阀和自动装置的调整。

49. air tightness test and safety valve adjusting for main air receiver (control air receiver, air horn receiver)on board.

主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整。

50. safety valve adjusting and accumulating test for auxiliary boiler.

辅锅炉安全阀检验及蓄压试验。

51. air tightness test for auxiliary boiler (economize boiler) on board.

辅锅炉(废气锅炉)装船后气密试验。

52. automatic controller test for auxiliary boiler.

辅锅炉自动控制装置试验。

53. function test for economizer.

废气锅炉效用试验。

54. function test and automatic controller test for ballast pump.

压载泵效用试验和自动控制装置试验。

55. function test of bilge oily water separator (sewage treatment plant, fresh water generator, incinerator).

舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验。

船舶制造英语日常用语 电气

1 inspection main cable installation for wheel house before paneling decoration.敷板前驾驶室检查主干电缆安装。2 measuring insulation resistance and reliability test ...

船舶制造英语日常用语一百句

一 船体。1 you must weld and grind this area before painting.在油漆之前你必须把这个地方电焊修补 打磨好。2 this welding line should be gouged and welded again before tightness ...

船舶制造必备英语日常用语句

好东西大家分享啊。船舶制造英语日常用语一 船体。1 youmustweldandgrindthisareabeforepainting.在油漆之前你必须把这个地方电焊修补 打磨好。2 这条焊缝在密性检查前要碳刨 再焊。3 右舷的结构跟左舷的不一样。4 weshouldreinforcethedown...